Cable & Pipelay Equipment
Pipe Handling
Our pipe clamping system is based on a successful friction clamp design, originally developed for J-laying steel rigid pipes in deep water.
![](https://www.caley.co.uk/wp-content/uploads/2022/05/pipe-handling-friction-clamp2.jpg)
Powerful Pipe Handling Systems
These systems can carry loads, in excess of 1,200-tonnes and are integrated with the pipelay vessel’s Supervisory Control and Data Acquisition (SCADA) system.
Contact Us
Need a safe, well designed, high quality handling system for your offshore equipment? Contact us to discuss.